What's new

November Status update

Raddonkey

Member
Founding Member ⚙️
Joined
Apr 30, 2024
Messages
57
Reaction score
60
Current Ride
22 Ram 3500 Dually, 22 Jeep Mohave, 22 Polaris Pro R #2921, 24 Blitzkrieg TT #6121, 66 Ford F100 Class 8, 05 C6, 93 Cummins
Current Ride #2
25 RHO on order
Got a call from the local dealer with an update. He said that the dealer call today Stellantis stated that they have 2693 Sold orders with only 90 built and only one that has actually shipped. There is plans to move forward with more running down the line in the near future. Hope so as mine was ordered on 4/25/24 and confirmed on 4/26 .. Hey Anthony just checking to see if you where on this call and have any more info for us..

Thanks RD
 
Got a call from the local dealer with an update. He said that the dealer call today Stellantis stated that they have 2693 Sold orders with only 90 built and only one that has actually shipped. There is plans to move forward with more running down the line in the near future. Hope so as mine was ordered on 4/25/24 and confirmed on 4/26 .. Hey Anthony just checking to see if you where on this call and have any more info for us..

Thanks RD
You have to do the @AnthonyRI thing to get his attention.
 
Our conference calls were on the 1st for our region, others may have been later.
Yes they continue to say that production should be ramping up very soon to a # in the hundred(s) per week (varies depending on who says it and when)

I did however get some other data today that is NATIONAL (remember, unless I say this, I'm normally speaking only Mark Dodge)
Unfortunately there is no correlating data points here like options or order dates, just overall orders in system and their status.

B - 19
C - 26
D - 2173
D1 - 44
E - 26
F - 36
I - 35
J - 235
K - 86
KZX (DELIVERED) - 1 (not ours)
 
Our conference calls were on the 1st for our region, others may have been later.
Yes they continue to say that production should be ramping up very soon to a # in the hundred(s) per week (varies depending on who says it and when)

I did however get some other data today that is NATIONAL (remember, unless I say this, I'm normally speaking only Mark Dodge)
Unfortunately there is no correlating data points here like options or order dates, just overall orders in system and their status.

B - 19
C - 26
D - 2173
D1 - 44
E - 26
F - 36
I - 35
J - 235
K - 86
KZX (DELIVERED) - 1 (not ours)
Does anyone have the status key?
 
Does anyone have the status key?
 
Thank you!
 
complete list

Status Codes

The entire list is not necessarily in order, depending on your build you may skip a step or move up or down the list as required.

Unscheduled:
BA – order entered in system by dealer
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passed edit but cannot be scheduled regardless of sold status
BX – good order available for scheduling

Scheduled:
C – Tentative schedule. Your order is "subfirm". The plant can see the order at this point but it's not fully committed to building as the supplier may or may not be able to get parts to the plant to build the vehicle.
D – Firm schedule: serial number assigned. Firm order. (This is when you get your VIN assigned)
D1 – Gate line: unit sequenced for production (Get an estimated build date)

Build:
E – Framing. Metal is welded together to form the body and frame. The body is inspected at the end of this step to ensure it's within tolerances.
F – Paint. The metal is coated, primed, sprayed, clear coated, polished, inspected, and hand finished if necessary.
G – Trim. The engine is installed in the chassis, the interior is installed, the chassis is mated to the body, the bed is put on. At the end of this, your new vehicle is built.

Built:
I – unit built, pending final inspection. Your vehicle goes through a battery of shakedown tests and measurements are taken to ensure the vehicle looks and performs as expected.
J – Vehicle passed final inspection but not released to carrier
** BUILD SHEET BECOMES AVAILABLE**
JB – shipped to body vendor. The vehicle is sent off site to have a spray liner put in, steps, graphics etc.
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced. The truck is ready to be shipped. The dealer is actually charged for the truck at this point and can be a source of delay. Typically two statuses here: "Awaiting Shipment" or "Staged for Shipment"

**WINDOW STICKER BECOMES AVAILABLE**

Transit Codes:
KZL – released but not shipped
KZM – first rail departure
KZN – first rail arrival
KZO – delayed/received
KZOA – plant hold, quality audit
KZOB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZOC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZOD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZOE – misdropped or misshipped vehicle
KZOF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZOG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZOH – all other “O” type carrier codes
KZP – Truck is sent offsite to a vendor location for shipping
KZR – First Move To Rail Station
KZS – Waiting on rail car
KZT – Second rail departure
KZU – Second rail arrival
KZY1 – major damage – must not be sold as new
KZY2 – major damage – vehicle sold at auction

KZX - Delivered to your dealer!


ZA – Order Canceled (either by you or your dealer)

thanks to
@tripleB
 
Our conference calls were on the 1st for our region, others may have been later.
Yes they continue to say that production should be ramping up very soon to a # in the hundred(s) per week (varies depending on who says it and when)

I did however get some other data today that is NATIONAL (remember, unless I say this, I'm normally speaking only Mark Dodge)
Unfortunately there is no correlating data points here like options or order dates, just overall orders in system and their status.

B - 19
C - 26
D - 2173
D1 - 44
E - 26
F - 36
I - 35
J - 235
K - 86
KZX (DELIVERED) - 1 (not ours)
Thanks for the info from your end, Sounds like they are correct numbers and sure hope they get to the 400+ a week soon.
 
Shows how far the e-shop is off (still showing 120 total).
 
Well that means that there’s like 419 trucks in production or built. Much better than the tracker but yeah hope they start really pushing them out before shutdown. Would be nice if they could get the parts for L0 before then but I think that would be wishful thinking
 
I hope the Level 0 I ordered last week isn't one of those in that B or C status while they decide if they're gong to build them or not. I want to see a "firm" order status regardless of how long the wait is.
 
Really underwhelming numbers, close to throwing in the towel.
 
Really underwhelming numbers, close to throwing in the towel.

Braveheart Hold.jpg

You'll hate yourself when one pulls up next to you in the future. Hopefully someone at SEMA this Wednesday tells me wtf is going on haha.
 
2693 orders left to build and currently they are at 30 trucks per day.. so about 3 months until they are all built unless they speed up the production
Ya as long as no one else orders in that 3 months... 😂
 
2693 orders left to build and currently they are at 30 trucks per day.. so about 3 months until they are all built unless they speed up the production
Are they running 7 days a week? I didn't think so but could be wrong.

Either way you have to factor in the new orders which will be prioritized at random and the holidays.
 
Our conference calls were on the 1st for our region, others may have been later.
Yes they continue to say that production should be ramping up very soon to a # in the hundred(s) per week (varies depending on who says it and when)

I did however get some other data today that is NATIONAL (remember, unless I say this, I'm normally speaking only Mark Dodge)
Unfortunately there is no correlating data points here like options or order dates, just overall orders in system and their status.

B - 19
C - 26
D - 2173
D1 - 44
E - 26
F - 36
I - 35
J - 235
K - 86
KZX (DELIVERED) - 1 (not ours)
Man. They are not ramping up production anytime soon. Only 44 in D1 for the whole Nation is odd, if not troubling. It seems like the have no plans to build any more this calendar year. Happy to entertain thoughts to the contrary.
 
Last edited:
Man. They are not ramping up production anytime soon. Only 44 in D1 for the whole Nation is odd, if not troubling. It seems like the have no plans to build any more this calendar year. Happy to entertain thoughts to the contrary.
But the good news is, they are shipping. They have shipped exactly 1 truck.....
 

Trending content

Back
Top