What's new

RHO Level 0 Discussion

99% positive his excerpt is from the bot that says that as well lol
To be completely accurate, my last was the "At the present time, we are still waiting for production to begin. I have involved our internal resources to assist in getting further review on the build of your 1500 RAM Truck."... SMH
 
Is this RAM messing with me or does it mean something? Any other L0 guys get an email saying “I see your current status is vehicle sequenced for production”.
My original order has shown as “scheduled” on the tracker since 9/27. But, it has not yet been built.

Is the email more reliable than the tracker? IDK
 
I got the same email for my April 25th order. My order is still unscheduled and never was scheduled as we understand that term. My dealer (big forum guy) indicated that what you and I consider "sequenced for production" or "scheduled for production" is much different than how Ram defines the term. Hopefully, however, you get built soon!
Yeah I get that sequenced doesn't mean much. I don't think anyone really know what the delay on L0 is either, maybe a bunch of L0 orders will all move through together once they sort it out.
 
I also tried tagging on to a previous Reddit post someone else made under Stellantis asking if anyone knew what’s going on with L0’s but I never got a response. Was hoping someone would spill the beans there.

Edit: I just posted a new thread to ask the question. Probably will get removed by Stellantis mods.. whatever
 
Last edited:
Yeah I get that sequenced doesn't mean much. I don't think anyone really know what the delay on L0 is either, maybe a bunch of L0 orders will all move through together once they sort it out.
Oh I hope they make a specific run of all L0’s when they get it figured out, but presume this will be next year after many L1’s are built.
 
My original order has shown as “scheduled” on the tracker since 9/27. But, it has not yet been built.

Is the email more reliable than the tracker? IDK
Mine has also shown the exact same schedule date of 9/27 for the past 2 months and hasn’t reverted back to “order confirmed” like many others. So hopefully that means ours will be built as soon as they start production on the base models.
 
9/16 here. I just commented on Stellantis new RHO YouTube short not happy lol
 
There was an RHO product manager named on a couple of the videos. Maybe we could hit him up on LinkedIn or something. Debating requesting L1 upgrade, or just buying a ZR2 or Raptor depending on how long the delay will be and if there’s a pathway out of L0 pit of despair.
 
There was an RHO product manager named on a couple of the videos. Maybe we could hit him up on LinkedIn or something. Debating requesting L1 upgrade, or just buying a ZR2 or Raptor depending on how long the delay will be and if there’s a pathway out of L0 pit of despair.
I wanted to order several things for RHO with Black Friday deals. But since we don’t even know what’s going on I can’t do that. Too risky, considering may have to back out.
 
I wanted to order several things for RHO with Black Friday deals. But since we don’t even know what’s going on I can’t do that. Too risky, considering may have to back out.
luckily i now im getting a TRX or RHO so pretty safe gamble LOL!
 
Also someone responded to my Reddit post asking about base model.

“They just redid all the timing across all the DT variants. XL was cancelled.”

No idea what that means.
 
I asked the question, hopefully he isn’t using XL as a reference to the base model…
 
If you check the update post from Koons it shows one base level 0 made it past D1 to E (frame) so hoping it gets built.

Still waiting 214 days now, and its is rough ..
 
If you check the update post from Koons it shows one base level 0 made it past D1 to E (frame) so hoping it gets built.

Still waiting 214 days now, and its is rough ..
True! And it is not one of the existing 9 on e-shop. I hope that’s really good news.
 
If you check the update post from Koons it shows one base level 0 made it past D1 to E (frame) so hoping it gets built.

Still waiting 214 days now, and its is rough ..
7 months. Sheesh… I just got to 3 months.
 
If you check the update post from Koons it shows one base level 0 made it past D1 to E (frame) so hoping it gets built.

Still waiting 214 days now, and its is rough ..
Just checked through coons last 4 updates it has been there the hole time in E
 
Just checked through coons last 4 updates it has been there the hole time in E
Well Sh*t .. LOL its must be the one that they realized they dont have the right parts to make it happen .. Bad RHO you go to time out !! LOL
 

Latest Discussions...

Trending content

Back
Top