What's new

In production - build

Entered production on 11/18, was told today that I am in JB status ("Latest update (JB STATUS): its on a truck to MOPAR CUSTOM SHOP OPERATIONS To STERLING HEIGHTS ASSEMBLY PLANT.") Not sure if it is on its way to or from custom shop operations. I have the bed utility group and running boards.
 
Entered production on 11/18, was told today that I am in JB status ("Latest update (JB STATUS): its on a truck to MOPAR CUSTOM SHOP OPERATIONS To STERLING HEIGHTS ASSEMBLY PLANT.") Not sure if it is on its way to or from custom shop operations. I have the bed utility group and running boards.
It's looks like around half of orders that go into production are getting stuck in JB status. There doesn't seem to be any relation to which options are ordered or not ordered. But if it doesn't finish production within a week it seems like the truck is delayed or not being updated on RAM/dealer tracker.
 
It's looks like around half of orders that go into production are getting stuck in JB status. There doesn't seem to be any relation to which options are ordered or not ordered. But if it doesn't finish production within a week it seems like the truck is delayed or not being updated on RAM/dealer tracker.
This seems accurate. Been stuck in JB for two weeks, while others that went into production after me and went are getting shipped within a few days.
 
Entered production on 11/18, was told today that I am in JB status ("Latest update (JB STATUS): its on a truck to MOPAR CUSTOM SHOP OPERATIONS To STERLING HEIGHTS ASSEMBLY PLANT.") Not sure if it is on its way to or from custom shop operations. I have the bed utility group and running boards.
They are basically a parking lot apart from each other. Mopar is basically JB
 
Who knows the building process of the trucks what are all the stages? Got an update from dealer that my truck is in the spray booth and I’m guessing that’s a very early step.
 
Updated this morning. As it has been the tracker is about 2-3 days behind and updating early morning. I’m optimistic it gets here before end of year.
 

Attachments

  • IMG_8204.png
    IMG_8204.png
    350.9 KB · Views: 55
Who knows the building process of the trucks what are all the stages? Got an update from dealer that my truck is in the spray booth and I’m guessing that’s a very early step.

list of all the codes and where that step is in the process,
 
Mine was built 11/26 and still waiting to ship. I haven’t seen a driving around. Anyone get theirs yet?
 
1733335901537.png

Updated this morning. My first ever update.
 
Mine was built 2 days before you and shipped on December 2nd dealer is telling me it will take about 1-2 weeks for shipping.
Good to know. I did have a feeling it would show up way before February. 🤞
 
What is the average wait time from Scheduled to Shipped, anyone know current timeline (average wait)? I'm trying to gauge wait times for those of us still stuck in D status from April-June, so if it becomes scheduled in January 2025, when will we get our trucks? I'm assuming if we move into D1 in January, we will have our trucks around April or May timeframe if I had to guess? Which is nearly or right at the 1 year mark from our order, which is completely fucked up. I would think the dealership needs to cancel all the old original orders, refund the $1k, submit new orders with that $1k, to get these moving. ***OR*** dealer needs to move heaven and earth on current orders with RAM, because at this point, this has gotten ridiculous, excuses gotta stop and someone needs to act and act now. I'm tired of hearing "we can't do anything...you know RAM is RAM". That's bullshit, someone CAN do something or knows someone that can do something. That's how the world works, you call a guy, and shit gets done. CALL THE GUY!!!!
 
IMG_0683.png
Must be a Mark Dodge week on the assembly line!
 
My tracker shows Built on 11-28. No update since then. My dealer called today and said my truck arrived this morning. So the tracker is behind for sure. I'm picking up tomorrow.

My dealer told me 3 weeks ago that my ship date was going to be 12-3. I think that's totally accurate, as I'm in central Ohio, about 4 hours from the plant. Came by truck, no need for a train, so that made shipping faster
 
The RAM website still says "Scheduled"

BUT:

I was told today that my truck is in F-Status.

Welding, Dip, and Paint then onto Assembly.

It has a tentative ship date of 12/11 and should arrive at the dealer in January.



My guess with changes to the political winds and Tavares gone as CEO, moving production out of the US isn't gonna happen.


Hopefully, the process for everyone speeds up...
 
Who knows the building process of the trucks what are all the stages? Got an update from dealer that my truck is in the spray booth and I’m guessing that’s a very early step.
Firm - D
Gate Line D1
Frame - E
Paint - F
Trim - G
Built not ok - I
Built - J
Body Vendor - JB
Emissions- JE
CONS Body Vendor - JJ
Storage - JS
Shipped - KZ
Delivered - X
 

Latest Discussions...

Trending content

Back
Top