May-April-June orders… who still isn’t scheduled?

Same here, nothing since the 6th. Hopefully it's taking longer because there fixing the problems that have come up since they started building them......I'm ok with that;)
The problem is, they’re not working at the factory. They’re all watching the playoff games.
 
Mine finally came in two days ago.. tracker said 1/24
 

Attachments

  • 75865758481__A0222EDB-E4DB-415C-99DB-0A7F37BDA925.webp
    75865758481__A0222EDB-E4DB-415C-99DB-0A7F37BDA925.webp
    292.8 KB · Views: 51
My eta went from 1/21 to 1/29
 
Mine went from scheduled to being built, wrong dealer, deal says ship date is 1/2, tracker with wrong dealer says April.

The tracker sucks

Anyway -- tracker is finally moving, says truck being built, FINALLY

Was anyone eles's tracker 'goofed up'

1737317450394.webp
 
Mine went from scheduled to being built, wrong dealer, deal says ship date is 1/2, tracker with wrong dealer says April.

The tracker sucks

Anyway -- tracker is finally moving, says truck being built, FINALLY

Was anyone eles's tracker 'goofed up'

View attachment 5452
Yes - should have been Mark Dodge. Was only temporary - happened right it was built. Changed back by the end of the day.
Screenshot_20241227_062543_Chrome.webp
 
Last edited:
So that's like two people out of like 12+ people that were scheduled on January 6 that have had movement since then.............oh and at least two more scheduled on January 8.
 
So that's like two people out of like 12+ people that were scheduled on January 6 that have had movement since then.............oh and at least two more scheduled on January 8.
My original 5/1 order finally updated yesterday to In Production. For anyone that may be interested in a Billet Silver L0 with the Bed Utility Group as the only other option, I imagine it should hit Mark Dodge in a month or so.
IMG_6386.webp
 
So I just called my dealership and asked my buddy,who happens to be the sales manager, what he saw on his end as far as the status of my order.
He said that my truck was in paint :rolleyes: even though the tracker still says it hasn't gone into production yet.(scheduled Jan 6)
Point is the tracker does seem to be updated the same for everyone so a call to the dealer you ordered it from should be as accurate as your gonna get, maybe...in theory :ROFLMAO:
 
QUESTION FOR FOLKS WHO HAVE THEIR TRUCKS:

A bunch of us that have been waiting since April/May have finally entered production.

Curious how things went for most recent deliveries.

How long from production to shipped? i.e. how long did it take to build?
and
How long from shipped to butt in seat?
 
QUESTION FOR FOLKS WHO HAVE THEIR TRUCKS:

A bunch of us that have been waiting since April/May have finally entered production.

Curious how things went for most recent deliveries.

How long from production to shipped? i.e. how long did it take to build?
and
How long from shipped to butt in seat?
IMG_0925.webp

Butt is not quite in the seat yet. Waiting for truck to hit dealer. It’s made it from MI to IN so far.
 
Did it REALLY SHIP? I DO NOT trust the tracker.

yours was really fast
Build time - 13 to 16 = 3 days
Build to ship - 13 to 19 = 6 days
Ship to 'butt in seat - 19 to TBD = TBD days

I have been in builds since 1/17, already 2x as many days as you. However, the tracker updates seem to lag 2-3 days. i.e. it updated to ship 1/17 on 1/19, 2 days later.

My dealer says ship schedule is 1/28 - if true, my build to ship would be 17 to 28 = 11 days, we shall see.

As chip design engineer, my habit is to try and measure everything, including variance - mine looks roughly 2x yours.
 
Did it REALLY SHIP? I DO NOT trust the tracker.

yours was really fast
Build time - 13 to 16 = 3 days
Build to ship - 13 to 19 = 6 days
Ship to 'butt in seat - 19 to TBD = TBD days

I have been in builds since 1/17, already 2x as many days as you. However, the tracker updates seem to lag 2-3 days. i.e. it updated to ship 1/17 on 1/19, 2 days later.

My dealer says ship schedule is 1/28 - if true, my build to ship would be 17 to 28 = 11 days, we shall see.

As chip design engineer, my habit is to try and measure everything, including variance - mine looks roughly 2x yours.
From my experience the tracker is behind 2 days like you said. Updates from 1/18 will show on 1/20 and so forth. Also seems to only update once a day at midnight? Not too sure.

The truck did actually ship. I saw the screenshot of the tracking from the dealer, it was in Goshen IN. KZM ship status code.
 
Did it REALLY SHIP? I DO NOT trust the tracker.

yours was really fast
Build time - 13 to 16 = 3 days
Build to ship - 13 to 19 = 6 days
Ship to 'butt in seat - 19 to TBD = TBD days

I have been in builds since 1/17, already 2x as many days as you. However, the tracker updates seem to lag 2-3 days. i.e. it updated to ship 1/17 on 1/19, 2 days later.

My dealer says ship schedule is 1/28 - if true, my build to ship would be 17 to 28 = 11 days, we shall see.

As chip design engineer, my habit is to try and measure everything, including variance - mine looks roughly 2x yours.
Did you speak to the dealership today and ask what status you were in? This is the code cheat sheet my dealer sent me. Like I said earlier he stated I'm currently F which is paint.
 

Attachments

  • Codes.webp
    Codes.webp
    156.7 KB · Views: 24
Did you speak to the dealership today and ask what status you were in? This is the code cheat sheet my dealer sent me. Like I said earlier he stated I'm currently F which is paint.
Yep told me it’s KZM today morning. And current location of the train is Goshen, IN
 

Latest Discussions...

Trending content

Back
Top